Project Details
Area: Windstone Blvd, Brentwood, TN 37027
Duration: 14 weeks
Target Completion: May 2025
Overview:
The project involves demolishing the existing three-car garage ceiling and roof structure to build a new second-floor addition that connects to the existing house. The addition will include a media room, gathering area, bar area, flex room, and a porch. A spiral staircase will be installed to provide access to the pool area. The construction will ensure structural integrity, proper insulation, and seamless integration with the existing home.
Scope of Work:
This project involves structural framing, roofing, electrical, plumbing, HVAC installation, interior/exterior finishing, and safety compliance. The addition will be designed to maintain energy efficiency and functionality while complementing the architectural aesthetics of the house. All work will adhere to local building codes, and necessary permits will be secured before construction begins.
Project Gallery
